Off-planHandoverJanuary 2030
DeveloperMeraas HoldingThe edit at D3
⌖Dubai,Dubai Design District,The Edit at D3
Dubai,Nad Al Sheba,Nad Al Sheba 1,Nad Al Sheba Gardens,Nad Al Sheba Gardens 9
Nad Al Sheba Gardens Phase 9 is an off-plan residential release by Meraas Holding in Nad Al Sheba 1, within the Nad Al Sheba Gardens community in Dubai. The gated development comprises a collection of 3- to 7-bedroom townhouses and villas, bringing contemporary residential design together with landscaped open areas for family-oriented living.
With handover scheduled for March 2029, homes are available from 9,500,000. The 20/20/60 payment plan is structured as 20% at booking, 20% during construction and the remaining 60% on handover. A 4% government fee applies. The project is offered on a freehold basis and is recorded as one building.
Located in Nad Al Sheba 1 in the Meydan district, the community combines a quieter residential setting with access to principal Dubai routes. Al Ain Road and Al Khail Road provide connections to key commercial, leisure and city destinations.
The townhouses feature clean-lined contemporary façades, expansive windows and bronze aluminium screens that contribute to privacy. Earth-toned finishes complement the surrounding landscape, while backyards open towards pocket parks and shaded pedestrian routes.
Villas are arranged over a ground floor and two upper levels. Selected design features include double-height living and dining areas, private gardens and swimming pools, with layouts created to suit differing family requirements. Across both home types, large openings are intended to bring daylight into the interiors and strengthen the relationship between internal living areas and the outdoors.
Shared facilities are planned to support recreation, wellness and social gatherings. Landscaped routes and green spaces form part of the community environment, alongside areas for residents of different ages.
Interconnected paths link residences with parks and communal facilities, creating pedestrian access through the development. Pocket parks, mature trees, selected planting and shaded areas shape the outdoor setting, while sustainable design elements form part of the community approach. The controlled gated environment is planned with family safety and multi-generational use in mind.
Meraas Holding has planned Nad Al Sheba Gardens Phase 9 as a gated part of the wider Nad Al Sheba Gardens community. The masterplan brings villas and townhouses into a landscape-led setting of pocket parks, shaded walkways and interconnected pedestrian paths. Generous glazing, earth-toned façades and direct garden connections to green areas are incorporated into the residential design.
Community spaces include lagoons, a wave pool, running tracks, yoga lawns, an events lawn, an amphitheatre and shaded seating. Mature trees, selected flora and landscaped open areas contribute to the neighbourhood setting, while Al Ain Road and Al Khail Road provide links from Nad Al Sheba 1 to Dubai's wider districts.
The payment plan is 20/20/60: 20% is due at booking, 20% is payable during construction, and 60% is due on handover.
The project is an off-plan, freehold development by Meraas Holding in Nad Al Sheba 1. It offers 3- to 7-bedroom townhouses and villas from AED 9,500,000, with a March 2029 delivery date and a 20/20/60 payment plan. Its community offering includes lagoons, a wave pool, running tracks, yoga lawns, an amphitheatre and pocket parks. Investment suitability should be assessed against an individual buyer's objectives.
Nad Al Sheba Gardens Phase 9 is scheduled for delivery in March 2029.
The project is located in Dubai, in Nad Al Sheba 1 within the Nad Al Sheba Gardens community.
Yes. Nad Al Sheba Gardens Phase 9 is a freehold development.
Prices start from AED 9,500,000.
The development offers townhouses and villas, including 3- to 7-bedroom options.
Nad Al Sheba Gardens Phase 9 is developed by Meraas Holding.